# Solaimuthu A (Solai)

Software Development Engineer II at Blackstraw.ai, Chennai, India. I build multi-agent systems that show their work.

Email: solaimuthu006@gmail.com · GitHub: https://github.com/redwing-381 · LinkedIn: https://www.linkedin.com/in/solaimuthu-a-87191225a/

## Sheets

- 00 Cover (Chennai, now): SDE II at Blackstraw.ai. I build multi-agent systems that show their work. https://solaimuthu.vercel.app/#cover
- 01 Look Closely (A village near Kallakurichi, before 2022): Pencil came before code. Drawing taught me to look for construction lines first. https://solaimuthu.vercel.app/#look-closely
- 02 Stayed Back (Chennai · LICET, 2022–2026): I stayed back after class: Pattarai, FabLab, go-karts, first hackathon wins. https://solaimuthu.vercel.app/#stayed-back
- 03 Wings (Toulouse, France, Jun–Jul 2025): A student-team study re-engineering a regional airliner around hydrogen. My part: the fuel cells. https://solaimuthu.vercel.app/#wings
- 04 Production (Blackstraw.ai, Chennai, Aug 2025–now): Production multi-agent systems: a supervisor, specialists, scoped tools, and a human before every write. https://solaimuthu.vercel.app/#production
- 05 Evidence (Graph Hacks 2026, Oct 2026): Why-Graph: agents must prove why production broke as a graph path, then block the repeat. https://solaimuthu.vercel.app/#evidence
- 06 Budget (Hacker House Goa 2026, Aug 2026): RAG in Goa: retrieval inside a hard 200 ms deadline. We measured a reranker and cut it. https://solaimuthu.vercel.app/#budget
- 07 Loose Pages (Everywhere, 2024–2026): Just start: a dated ledger of hackathon builds, and ProjectX, the one I built for myself. https://solaimuthu.vercel.app/#loose-pages
- 08 Your Turn (Here, now): Ask the sketchbook anything about my work, or leave a note. https://solaimuthu.vercel.app/#your-turn

## Why-Graph

Agents that must prove why production broke as a graph path, then block the next agent from repeating it.

- Dates: 15–18 Oct 2026 · Graph Hacks 2026 (WeMakeDevs × FalkorDB)
- Team: team of 2 with Shoban Ravichandran
- My part: Agent runtime and the four agents, ingest, MCP server, PR Guard, UI, demo app, live deploy, demo video
- Verified: 453 ms safe minimum the guard enforced; 167 passing tests; 5 MCP tools for other agents; ~950 nodes in the demo graph
- Result: judging pending
- Case study: https://solaimuthu.vercel.app/work/why-graph

## RAG in Goa

Multilingual voice Q&A with hybrid retrieval inside a hard 200 ms deadline, and a reranker we measured and cut.

- Dates: Aug 2026 · Hacker House Goa 2026 task
- Team: team of 3 with Merlyn Michelle, Shoban Ravichandran
- My part: Retrieval pipeline rework, Sarvam Bulbul TTS, Colab GPU index, latency and architecture docs, deploy, mobile UI
- Verified: 76.85 ms retrieval P95, live; 215,608 chunks indexed; 200 ms hard retrieval deadline; ~160 ms reranker cost, so it shipped off
- Result: no result recorded
- Case study: https://solaimuthu.vercel.app/work/rag-in-goa

## Production agents at Blackstraw.ai

A supervisor, specialist agents, scoped tools, durable state, and a human before every write.

- Dates: Aug 2025–now
- Team: team at Blackstraw.ai
- My part: Persistence layer, AG-UI adapter, run cancellation, MCP audit trail, tests (contributor to the orchestration system)
- Verified: 3 specialist agents behind the supervisor; 28+ tests I wrote
- Result: in production
- Case study: https://solaimuthu.vercel.app/work/production-agents

## ProjectX

Texts only the truly urgent messages to a keypad phone, so the smartphone can stay in the bag.

- Dates: Jan 2026 · Dynamous × Kiro hackathon
- Team: solo
- My part: Solo: FastAPI backend, Kotlin Android listener, 3-stage classifier, PyPI CLI
- Verified: 17 property-based tests; 18 days solo build; 160 characters SMS limit
- Result: no result recorded
- Case study: https://solaimuthu.vercel.app/work/projectx

## Hybrid ATR 72-600

A student-team design study re-engineering a regional airliner around hydrogen fuel cells and batteries.

- Dates: Jun–Jul 2025 · ICAM summer programme, Toulouse
- Team: team of 4 with Dennyson, Gopika Sree, Pavithra
- My part: Hydrogen technology: fuel-cell design, hydrogen storage, safety systems
- Verified: 3,258.1 kWh mission energy; 22,500 kg team's takeoff-weight target; 3 h 05 min mission flight time
- Result: student design study
- Case study: https://solaimuthu.vercel.app/work/hybrid-atr

## Tally Stack

An accounting product built in 24 hours at the Odoo finals; the AI proposes, a human confirms.

- Dates: 5–6 Sep 2026 · Odoo Hackathon 2026 finals
- Team: team of 3 with Merlyn Michelle, Shoban Ravichandran
- My part: The whole Next.js frontend, the pricing-anomaly agent, PDF reports, Odoo scaffolding (base assistant: Merlyn)
- Verified: 24 hours build window at the finals; top 10% how the team qualified
- Result: built at the finals; result not recorded
- Case study: https://solaimuthu.vercel.app/work/tally-stack
